0193

  • Industry Water/Waste water/Desalination
  • Problem Corrosion / Erosion and Safety Surfacing
  • Country United States
  • Project Goal

    Repair and Protection

  • Products Used CeramAlloy CL+AC and CeramAlloy CP+AC
  • Status Completed

Located at a wastewater treatment facility, this impeller from a 25 year old pump was headed to the scrap yard.

Replacement parts for the pump were obsolete and the city was considering replacing the pump for $12,000+ and 8 weeks of downtime. After grit blasting the impeller and minimal welding, the veins were rebuilt with CeramAlloy CP+AC.

Followed by 2 coats of CeramAlloy CL+AC.

This repair and protection application only took 1 week to complete and the total cost for material and labor was less than $4,000. Problem Solved!

Project Images