The Larnaca Sewerage Board’s (LSDB) primary mission is to consistently enforce those Legislations which ensure the construction, operation and management of the sewerage system of the wider Larnaca area, thus contributing to the improvement of the residents’ quality of life, always aiming at optimizing and making full use of renewable energy sources such as reusing recycled water and bio-sludge.
Over the past years, ENECON Mesogios Ltd has provided us solutions on numerous projects with issues on corrosion, chemical attack, leaking pipes as well as moisture from hydrostatic pressure. Our latest project involves the complete overhaul of a Wet Well pumping station within Larnaca municipality sewerage limits. Works involved repairing of wall lining using high-performance polymer resins followed by applying multiple coats of CHEMCLAD GP by ENECON USA, a coating that can protect structures from an aggressive chemical environment.
Our collaboration has been great so far and we would definitely reach out for their services in the future.