0348- Hydro power station in scotland solves cavitation problem on their turbines with ENECON

Industry: Power
Problem: Cavitation
Project Goal: To rebuild, resurface and protect the components from cavitation
Location: United Kingdom
Status: Completed
Products Used: DuraTough DP, DuraTough DL
Project Description

This hydroelectric power station, built in the 1930’s, wanted to protect all four of their Francis Turbines from accelerated cavitation attack.

The ENECON U.K. Engineering Team recommended the FLEXICLAD DuraTough system to rebuild, resurface and protect these vital components from future cavitation damage. After a thorough investigation, the plant engineers were ‘sold’ on the DuraTough system.

After thorough grit blasting, the cavitated areas of the turbine blades were first rebuilt with DuraTough DP and then the turbine blade surfaces were coated with the full DuraTough DL system (DuraTough Primer + DL green + DL blue).

The entire project was successfully completed in just 5 days utilizing a six-person crew ably supervised by the local, U.K. based, ENECON field engineer.

 

Project Images