0182- Power Plant Cooling Tower

Industry: Power
Problem: Leak repairs
Project Goal: Leak repair
Location: United States
Status: Completed
Products Used: DurAlloy used for Rebuilt, CeramAlloy CL+AC used for Protection, DuraWrap used for Protection
Project Description

This 24 inch diameter intake pipe, located at a U.S. Power Plant, was leaking above the ground just below the disc valve.

The plant’s maintenance engineers needed a proven, reliable and economical solution to this problem. The local ENECON Distributor was called in to develop a solution. First the exterior surface of the pipe was ‘bristle blasted’ to promote maximum adhesion by removing all existing failed coatings and corrosion.

Once the preparation was completed, a 12 x 12 x 1/8 inch thick curved steel plate was prepared and ‘cold welded’ over the holed area of the pipe using ENECON’s DurAlloy.

That was followed by the application of two layers of the DuraWrap Carbon Fiber Pipe Wrap System. CeramAlloy CL+AC was then applied to the entire area as a final layer.

 

Before Work

 
 

After Cleaning

 
 

After Work